Renaturation Schweizerbach Weinstadt
07 February, 2024
Client: City Weinstadt
Contracting authority: A24 Landschaft
Executing company: Rossaro Bauunternehmung Aalen
Construction period: 2022 bis 2023
Renaturation of the Schweizerbach in Weinstadt over a length of approx. 700m, including path construction, embankment design and a seating grandstand to the water.